Afsin Elbistan B Coal Fired Thermal Power Plant” Fly ash hauling & stockpiling, K.Maras
- First truck based fly ash handling project in Turkey
- Stockpiled 18.000.000m³ of fly ash
- Design of state-of-the-art conveyor-to-truck transfer system
- Largest coal fired power plant of Turkey, 1440MW installed power,
Status : Completed in 12.04.2010
Construction of Rubber Dam, Aydın
- The first rubber dam to be built in Turkey
- Includes dredging of B. Menderes River
Usage : Irrigation, Flood Prevention, Wild Life Preservation
Status : Completed in 2003
Construction of Keskin Dam, Eskisehir
Usage : Irrigation and Flood Prevention
Height of the Dam : 28,6 mt.
Water Storage Capacity : 8,5 million m³
Status : Completed in 1997 (in 3 years’ time)
Construction of Koyunlu Dam, Niğde
Usage : Irrigation and Flood Prevention
Water Storage Capacity : 1,25 million m³
Status : Completed in 1993 (in 4 years’ time)
Design, Construction and Management of Reinforced Concrete Pipe Factory, Pamukova
- ø200-700mm reinforced concrete pipe production capability
Usage : Underground irrigation system
Status : Completed in 3 months
Design of Reinforced Concrete Pipe Factory, İzmir
- ø2100mm reinforced concrete pipe production capability
Usage : Sewer System
Status : Completed in 3 months