Skip to content
  • Dokar A.Ş.
  • Dokar A.Ş.
  • Dokar A.Ş.
Completed Projects Print E-mail

“Afsin Elbistan B Coal Fired Thermal Power Plant” Fly ash hauling & stockpiling, K.Maras

  • First truck based fly ash handling project in Turkey
  • Stockpiled 18.000.000m³ of fly ash
  • Design of state-of-the-art conveyor-to-truck transfer system
  • Largest coal fired power plant of Turkey, 1440MW installed power,
  • Status : Completed in 12.04.2010

Construction of Rubber Dam, Aydın

  • The first rubber dam to be built in Turkey
  • Includes dredging of B. Menderes River
  • Usage : Irrigation, Flood Prevention, Wild Life Preservation
  • Status : Completed in 2003

Construction of Keskin Dam, Eskisehir

  • Usage : Irrigation and Flood Prevention
  • Height of the Dam : 28,6 mt.
  • Water Storage Capacity : 8,5 million m³
  • Status : Completed in 1997 (in 3 years’ time)

Construction of Koyunlu Dam, Niğde

  • Usage : Irrigation and Flood Prevention
  • Water Storage Capacity : 1,25 million m³
  • Status : Completed in 1993 (in 4 years’ time)

Design, Construction and Management of Reinforced Concrete Pipe Factory, Pamukova

  • ø200-700mm reinforced concrete pipe production capability
  • Usage : Underground irrigation system
  • Status : Completed in 3 months

Design of Reinforced Concrete Pipe Factory, İzmir

  • ø2100mm reinforced concrete pipe production capability
  • Usage : Sewer System
  • Status : Completed in 3 months
 

bosgifbg

rd11
rd12
rd18
rd21
k176