"Afsin Elbistan B Coal Fired Thermal Power Plant” Fly ash hauling & stockpiling, K.Maras Print E-mail


Dokar
, EÜAŞ Afşin Elbistan Power Plant Unit B on fly ash hauling & stockpiling the work was completed on 12.04.2010. Afşin Elbistan Power Plant Unit B is the largest coal-fired (1440MW installed power) power plant in Turkey with a Flue Gas Desulphurisation unit. Dokar design team has designed and constructed a state-of-the-art ash handling system which has been operating flawlessly since 2004. The state-of-art ash handling system has safely stockpiled 18.000.000m³ of fly ash and FGD sludge since 2004.